Drywalling was done on the second and third days after the insulation was blown into the rafter bays. The drywalling was an incredible thing to behold. Each sheet was 4'x12' - not the weeny 4'X8' sheets cut in half lengthwise that I had installed at the practice hut. These guys were strong.
The drywall was screwed onto the rafters.