A dusty business.
Drywalling was done on the second and third days after the insulation was blown into the rafter bays. The drywalling was an incredible thing to behold. Each sheet was 4'x12' - not the weeny 4'X8' sheets cut in half lengthwise that I had installed at the practice hut. These guys were strong.
The drywall was screwed onto the rafters.